工程项目推价英文演讲稿

来源: 2022-12-13 21:28
Ladies and gentlemen:

Good afternoon

My name is Ge Jie, I am a construction budget.as a new employee, I am proud to be part of the Linkage Project of New Energy Engineering Co,Lid,OF CCCC Third Habor Engineering Co,Lid(Shanghai).On behalf of the company, I am delighted to take part in this competition. It is always a pleasure for  me to have an opportunity to exchange ideas with our leaders and workers

As we all know, our enterprise is a professional company in the field of offshore wind power.nowI have a question.do you know offeshore wind power ? yes or no ?ok,let me make a explaination ,offshore wind power is a technology that make use of wind turbine to transform wind energy into electricity.Combining  rich wind energy resources and feasible technology ,  offeshore wind power have become a rapidly developing  market in recent years.

today the project which I am about to introduce is a  offshore wind power project: Zhuhai Guishan Offshore Wind farm ,which was just built by our company. The project is located in Wanshan District, Zhuhai, Guangdong Province Its construction cost is 222.53 million yuan, and the installed capacity of  this wind farm is 102MW (何时开工,历时多久) The project not only adopts the installation of aeeembled parts technology but also covers two types of wind turbines. This wind farm ,which aims to solve the surrounding island electricity dilemma .is also one of the key projects for the construction of offshore wind power of China Communications Construction Third Habor Engineering Co,Lid,

Moreover, it  adopts the foundation of  steel tubular jacket, and it is also the first structural foundation of this type used in China. There are four key points in the construction of steel tubular jacket:Extremely high  requirements for welding quality and piling accuracy,Underwater frequency modulation and Underwater grouting.

In the process of the construction, we explored the “completed sets of technology research and application of  offshore wind turbine installation” theory, which has been subject to the appraisal of China Water transportation Construction Association. After the evaluation, the association identifies that some  of our products lead the world.

 During the construction, there was an episode. ten days before the super typhoon “tiange” struck, Mr Dong Jie—manger of the project, accurately predicted that the typhoon would pass through the construction area of the project, according to  his many years experience in offshore operations. Therefore, he quickly took measures and avoided asset losses successfully.

How amazing!

The project also refreshed the record of wind turbine installation twice. The first time was on June 10, 2017 when The first two wind turbines was installed within 17 hours. Shortly after, Under the bad construction environment, two different models were completed within 13 hours which broke the record again. What’s more,This project has won unanimous praise from the owners, supervisors and suppliers, and they expressed the willingness to cooperate with us more. It also laid a solid foundation for CCCC THIRD HARBOR ENGINEERING Co,Ltd. in the southern offshore wind power market and increased the brand influence of “san hang wind power”

In the process of preparing for this competition, , I have a better understanding of  companys glorious history and bright prospect,and have a better sense of the hardship and greatness of  companys predecessors .and more and more believe that the future of Sanhang New Energy will Getting better and better!


编辑推荐:

下载Word文档

温馨提示:因考试政策、内容不断变化与调整,长理培训网站提供的以上信息仅供参考,如有异议,请考生以权威部门公布的内容为准! (责任编辑:长理培训)

网络课程 新人注册送三重礼

已有 22658 名学员学习以下课程通过考试

网友评论(共0条评论)

请自觉遵守互联网相关政策法规,评论内容只代表网友观点!

最新评论

点击加载更多评论>>

精品课程

更多
10781人学习

免费试听更多

相关推荐
图书更多+
  • 电网书籍
  • 财会书籍
  • 其它工学书籍
拼团课程更多+
  • 电气拼团课程
  • 财会拼团课程
  • 其它工学拼团
热门排行

长理培训客户端 资讯,试题,视频一手掌握

去 App Store 免费下载 iOS 客户端