电话:0731-83595998
导航

2018年职称英语考试理工类阅读理解练习题(2)

来源: 2018-09-27 19:51

   London's First Light Rail System

  The Docklands Light Railway (DLR) took just three years to build at a cost of £77 million. It is London's first Light Rail System, but its route follows that of a number of older lines, which carried the nineteenth century railways through the crowded districts of the East End.

  The section of the line from the Tower Gateway Station to Poplar follows the line of one of London's earliest railways, the London & Blackwell (1840), a cable-drawn railway (later converted to steam) which carried passengers to steam ships at Blackwell Pier, and provided transport for the messengers and clerks who went backwards and forwards between the docks (码头) and the city every day.

  From Poplar to Island Gardens, a new line crosses high above the dock waters, and then joins the old track of the Millwall Extension Railway, built to service the Millwall Docks (1868) and to provide transport for workers in the local factories. This line was horse-drawn for part of its route, until the 1880s.

  The Poplar to Stratford section of the DLR route was first developed by the North London Railway, built in the 1850s to link the West and East India Docks with the manufacturing districts of the Midlands and North of England. There were major railway works and sidings (岔线) at Bow until recently.

  The trains are automatically controlled from a central computer, which deals with all signaling and other safety factors, as well as adjusting speeds to keep within the timetable; on board each vehicle, Train Captains, who are also fully qualified drivers, are equipped with two-way radios to maintain contact with central control. There are passenger lifts, and self-service ticket machines, at every station.

  1 The passage tells us that London's first Light Rail System

  A was constructed in the nineteenth century.

  B will be finished in three years' time.

  C follows some of the original lines.

  D took three years longer than expected to complete.

  2 We learn from the passage that the London & Blackwell railway

  A now carries passengers to and from the docks.

  B was a busy line a few years ago.

  C used to employ many messengers and clerks.

  D was not originally a steam railway.

  3 "This line" in Paragraph 3 refers to

  A the line from the Tower Gateway Station to Poplar

  B the line from Poplar to Island Gardens.

  C the Millwall Extension Railway.

  D the line from Poplar to Stratford.

  4 It appears that the Poplar to Stratford section of the DLR route was originally developed to

  A promote travel in the Midlands.

  B encourage trade with the North of England.

  C create employment.

  D make the transport of goods easier.

  5 The trains on the DLR are controlled by

  A an on-board central computer.

  B a computer engineer on board.

  C two-way radios operate by the drivers.

  D a computer center based somewhere along the line.

  答案:1. C  2. D  3. C  4. D  5. A

编辑推荐:

下载Word文档

温馨提示:因考试政策、内容不断变化与调整,长理培训网站提供的以上信息仅供参考,如有异议,请考生以权威部门公布的内容为准! (责任编辑:长理培训)

网络课程 新人注册送三重礼

已有 22658 名学员学习以下课程通过考试

网友评论(共0条评论)

请自觉遵守互联网相关政策法规,评论内容只代表网友观点!

最新评论

点击加载更多评论>>

精品课程

更多
10781人学习

免费试听更多

相关推荐
图书更多+
  • 电网书籍
  • 财会书籍
  • 其它工学书籍
拼团课程更多+
  • 电气拼团课程
  • 财会拼团课程
  • 其它工学拼团
热门排行

长理培训客户端 资讯,试题,视频一手掌握

去 App Store 免费下载 iOS 客户端