videoconference, Secretary of the provincial Committee of Xia Baolong stressed: this year is the "five water trea tment" "357" timetables "for three years to resolve outstanding issues, obv ious ly worked," victory of the year. The County 's departments at all levels mus t firmly establis h the "gua nghui is gold and silver" green development concept, convinced that Castle is not relaxed, always mainta ining strategic ability and strong determination to improve the environment, consistently playing well "five water treatment of" winning the war, ever-higher levels of comprehens ive well-off society was built. (A) lay the sewage uphill battle. This year we will "river water quality improved at the county level, up to five" this bas ic objective grasp of pollution control that focus, with the focus on three things: a good job, "clear rivers" reaching the County crea ted. Organization "look back" specia l inspection, the County garbage River, black and odorous River is "Dragnet" investigation, timely rectification of
problems found in place firmly to prevent river pollution rebound. In accordance with the "one-stop strategy", improving the inferior five water quality monitoring stations work this year to ensure the Elimination of 1 prov incial control, five water quality section 3 municipalities controlled deterioration, ens ure the creation this year of "clear rivers" standards. Second, pay special attention to pollution-cutting cons truction of nanotubes. Intercepting nanotubes are the basis of pollution of water source engineering, engineering, matter of success or failure of water management. Urban sewage treatment, to improve "effluent from sewage trea tment rate, running accuracy, complia nce" requirement, speed up the town's support network construction, is focus ing on nanotubes home "las t meters" question. Domestic sewage treatment in rural areas, this year is the final year of the three-year action, determination to fight and the momentum around, ending the battle on which fully to ensure the
rea lization of all County 648 formed village coverage. Also, be sure to attach importance to focus on rural domestic wastewater treatment facility operation and management, ensure that wastewa ter trea tment facility up and running, role play, avoid the "Sun" problem. Third, pay specia l attention to the River Lake pond desilting operation. Provinces now have focused on pollution control of water go to "dig up mud", as the deepening water of this year's "plays". Next, to jump-start an investigation line touches work, implementation plan according to the priorities and the prog ramme of work, in accorda nce with the "one river one policy" requires detailed cleaning, dredging plan, planning ahead of time clea ning out mud "way out", according to loca l conditions to do sludge, promote scientific res ource utilization of silt and mud. (B) the heavy regulation of heavily polluting indus tries. Pollution of water must grab the source, wastewater is primarily the source of backward production capacity,
increase the intensity of
2010 年一级建造师建筑工程考试真题及答案
一、单项选择题(共 20 题,每题 1 分。每题的备选项中,只有 1 个最符合题意)
1.在建筑结构中,从基础到上部结构全部断开的变形缝是( )。 P9
A.伸缩缝
B.沉降缝
C.防震缝
D.温度缝
2.如图所示,Pl、P2 分别为两个相互垂直力的合力。关于 P1、P2 的关系,正确的是
( )。P9
A.P1=P2
B.P2=3P1
C.P1D.P2>3P1
(
)
3.下列常见建筑结构体系中,适用房屋建筑高度最高的结构体系是( )。 P16
A.框架
B.剪力墙
C.框架一剪力墙
D.筒体
4.大跨度混凝土拱式结构建(构)筑物,主要利用了混凝土良好的( )。 P19
A.抗剪性能
B.抗弯性能
为了促进本公司各项经营活动由事后管理向事前管理方式的转变,强化生产经营全过程控制,提高资金使用的计划性,特制定本管理办法,以增加公司资金运行的透明度,降低各项成本,使有限的资金发挥最大的效能。 trea tment of heavily polluting industries. According to municipal, and municipal government deployment of seven big heavy pollution indus try regulation "three years action plans", requirements to December 2016 end of Qian, all included shut stopped eliminated of enterprise all shut stopped eliminated in pla ce; June 30, 2017 Qian, all included place regulation upgrade and agglomeration restructuring of enterprise by unified standard regulation in place, late not standard of enterprise are implementation discontinued; June 30, 2018 Qian, all intends Park production of enterprise relocation Park in place, la te not Park of are discontinued. In the process of renovation, will focus on four aspects: to firmly close the high energy consumption and heavy pollution, hopeless enterprise governance and production lines, eliminated a number of yearly emiss ion intens ity, low value-added products of backwa rd production capacity. Second, we mus t strictly enforce the
space, total project "Trinity " environment access system, promoting indus try access and environmental conditions of access of enterprises to the Park, industrial park, in principle, no longer the class on the new project. Thirdly, promoting replacement and recons truction of heavily polluting industries, mergers and reorganizations, guide enterprises to energy conservation, recycling and low-carbon and clean production, and improve the level of green development. Four to esta blis h a long-term supervision mechanism, increase the intensity of specia l inspections, investigate and punish the rectification is not in place, normal business of running anti-pollution installations do not. (Iii) linkage to promote flood control water, drainage, water supply, improving water saving. Speed up cross Yang suppor t river dike reinforcement, and along Pu seawall except insurance reinforcement, and Lake Qian sluice, and BA Cao sluice, and cloud cover reservoir, focus flood control dra inage engineering
construction, vigorously implementation "strong library" "solid di" "sprea d row" engineering, increased geolog ical disaster hidden points governance efforts, solid advance small basin torrent disaster governance, efforts from essentially solution basin sex, and regiona l flood control dra inage capacity insufficient of problem. Vigorously implement the piers, algae and other water sources protection and, promoting rural drinking water safety projects, setting up water pricing reform and environmenta l protection mechanism, guiding water depth. Further soil pollution and repa ir, streng then agricultura l non-point source pollution prevention, mountain, water, forests, fields, lakes, various elements mutual long. Four, manage to tighten control, to play "three to split" battle. Xia Baolong, Secretary of provincial party Committee stressed that while the "three to split" operation time is over three years, but "three to split" must continue to catch on, and resolve a split cannot be changed. All loca lities
and departments to the village and "no una uthorised" crea ted
videoconference, Secretary of the provincial Committee of Xia Baolong stressed: this year is the "five water trea tment" "357" timetables "for three years to resolve outstanding issues, obv ious ly worked," victory of the year. The County 's departments at all levels mus t firmly establis h the "gua nghui is gold and silver" green development concept, convinced that Castle is not relaxed, always mainta ining strategic ability and strong determination to improve the environment, consistently playing well "five water treatment of" winning the war, ever-higher levels of comprehens ive well-off society was built. (A) lay the sewage uphill battle. This year we will "river water quality improved at the county level, up to five" this bas ic objective grasp of pollution control that focus, with the focus on three things: a good job, "clear rivers" reaching the County crea ted. Organization "look back" specia l inspection, the County garbage River, black and odorous River is "Dragnet" investigation, timely rectification of
problems found in place firmly to prevent river pollution rebound. In accordance with the "one-stop strategy", improving the inferior five water quality monitoring stations work this year to ensure the Elimination of 1 prov incial control, five water quality section 3 municipalities controlled deterioration, ens ure the creation this year of "clear rivers" standards. Second, pay special attention to pollution-cutting cons truction of nanotubes. Intercepting nanotubes are the basis of pollution of water source engineering, engineering, matter of success or failure of water management. Urban sewage treatment, to improve "effluent from sewage trea tment rate, running accuracy, complia nce" requirement, speed up the town's support network construction, is focus ing on nanotubes home "las t meters" question. Domestic sewage treatment in rural areas, this year is the final year of the three-year action, determination to fight and the momentum around, ending the battle on which fully to ensure the
rea lization of all County 648 formed village coverage. Also, be sure to attach importance to focus on rural domestic wastewater treatment facility operation and management, ensure that wastewa ter trea tment facility up and running, role play, avoid the "Sun" problem. Third, pay specia l attention to the River Lake pond desilting operation. Provinces now have focused on pollution control of water go to "dig up mud", as the deepening water of this year's "plays". Next, to jump-start an investigation line touches work, implementation plan according to the priorities and the prog ramme of work, in accorda nce with the "one river one policy" requires detailed cleaning, dredging plan, planning ahead of time clea ning out mud "way out", according to loca l conditions to do sludge, promote scientific res ource utilization of silt and mud. (B) the heavy regulation of heavily polluting indus tries. Pollution of water must grab the source, wastewater is primarily the source of backward production capacity,
increase the intensity of
C.抗拉性能
D.抗压性能
5.关于建筑物体形系数和耗热量比值的关系,正确的是( )。 P22
A.体形系数越大,耗热量比值越大
B.体形系数越大,耗热量比值越小
C.体形系数越小,耗热量比值越大
D.耗热量比值与体形系数无关
6.在混凝土工程中,配制有抗渗要求的混凝土可优先选用( )。 P39
A.火山灰水泥
B.矿渣水泥
C.粉煤灰水泥
D.硅酸盐水泥
7.节水型卫生坐便器的用水量最小应不人于( )L. P55
A.3
B.5
C.6
D.8
8.当基体含水率不超过 8%时,可直接在水泥砂浆和混凝土基层上进行涂饰的是( )
涂料。
A.过氯乙烯
B.苯一丙乳胶漆 P69
C.乙一丙乳胶漆
D.丙烯酸酯
9.防水卷材的耐老化性指标可用来表示防水卷材的( )性能。 P74
为了促进本公司各项经营活动由事后管理向事前管理方式的转变,强化生产经营全过程控制,提高资金使用的计划性,特制定本管理办法,以增加公司资金运行的透明度,降低各项成本,使有限的资金发挥最大的效能。 ropetubeprotection.(3)positionoftheswitchboxmustbeplacedcorrectly,prohibit revePartsarenotalloweddirectcontactwiththeground,madeofimpermeablematerialatthebottompad100mm.D,packingandtransportforallmaterialsareusedtomakedecorativeuses,soallofthecompany'sfactoryfinishedandsemi-finishedproductsareimportedprotectivetapetoprotectthesurfaceofthematerial,soasnottodamagesurfaceduringtransport,Setup,andthentransportedbyfibrousbandsorpackedintothescene.Afterthematerialsdeliveredtothesite,specialprotectionandbuildersaroundcarefulcoordination.Allmaterialsdeliveredtothesite,whereareplacedinaventilatedshelter.8,on-siteinstallationoftechnicalcontrolandschedulecontrolofpersonnel'squalityandtechnologyisanimportantfactorindeterminingquality.Ourinstallersareprofesionallytrainedskiledworkers,thecompanydoingtheengineeringexercisetrainedanumberoftechnicalstandardshigh,strongoperationalskilsoftheconstructionteam,hasaccumulatedrichexperienceinconstruction.Forthisproject, selectedthebestpersonnelandequippedwithAdvancedinstallationtechniquesandequipment.Beforetheapproach,byrelevantleadersontheimportanceofthisproject,sothatinstalershaveenoughawarenessbytechniciansontherelevantstandardspecificationsandsafetyguidelinesalltechnologytoBuildergivesthelow-d
treatment
own.
of heavily polluting indus tries. According to municipal, and municipa l government deployment of seven big heavy pollution industry regulation "three years action pla ns", requirements to December 2016 end of Qian, all included shut stopped eliminated of enterprise all shut stopped elimina ted in place; June 30, 2017
Qian, all included pla ce regulation upgrade and agglomeration res tructuring of enterprise by unified standard regulation in place, late not standa rd of enterprise are implementation discontinued; June 30, 2018 Qian, all intends Park production of enterprise relocation Park in pla ce, late not Park of are discontinued. In the process of renovation, will focus on four aspects: to firmly close the high energy consumption and heavy pollution, hopeless enterprise governance and production lines, eliminated a number of yearly emission intensity, low value-added products of backward production capacity. Second, we must strictly enforce the space, total project "Trinity" environment access system, promoting industry access and environmental conditions of access of enterprises to the Park, industrial park, in principle, no longer the class on the new project. Thirdly, promoting replacement and recons truction of heavily polluting industries, mergers and reorganizations, guide enterprises to energy
conservation, recycling and low-carbon and clean production, and improve the level of green development. Four to establish a long-term supervis ion mechanism, increase the intensity of specia l inspections, investigate and punish the rectification is not in pla ce, normal bus iness of running anti-pollution installations do not. (Iii) linkage to promote flood control water, dra inage, water supply, improving water saving. Speed up cross Yang support river dike reinforcement, and along Pu seawall except insurance reinforcement, and Lake Qian sluice, and BA Cao sluice, and cloud cover reservoir, focus flood control dra inage engineering construction, vigorous ly implementation "strong library" "s olid di" "spread row" engineering, increased geological disas ter hidden points governance efforts, solid advance small basin torrent disaster governance, efforts from essentially solution bas in sex, and regional flood control drainage capacity ins ufficient of problem. Vigorous ly implement the piers, algae and
other water sources protection and, promoting rural drinking water safety projects, setting up water pricing reform and environmenta l protection mechanism, guiding water depth. Further soil pollution and repa ir, streng then agricultura l non-point source pollution prevention, mountain, water, forests, fields, lakes, various elements mutual long. Four, manage to tighten control, to play "three to split" battle. Xia Baolong, Secretary of provincial party Committee stressed that while the "three to split" operation time is over three years, but "three to split" must continue to catch on, and resolve a split cannot be changed. All loca lities and departments to the village and "no unauthorised" created
videoconference, Secretary of the provincial Committee of Xia Baolong stressed: this year is the "five water trea tment" "357" timetables "for three years to resolve outstanding issues, obv ious ly worked," victory of the year. The County 's departments at all levels mus t firmly establis h the "gua nghui is gold and silver" green development concept, convinced that Castle is not relaxed, always mainta ining strategic ability and strong determination to improve the environment, consistently playing well "five water treatment of" winning the war, ever-higher levels of comprehens ive well-off society was built. (A) lay the sewage uphill battle. This year we will "river water quality improved at the county level, up to five" this bas ic objective grasp of pollution control that focus, with the focus on three things: a good job, "clear rivers" reaching the County crea ted. Organization "look back" specia l inspection, the County garbage River, black and odorous River is "Dragnet" investigation, timely rectification of
problems found in place firmly to prevent river pollution rebound. In accordance with the "one-stop strategy", improving the inferior five water quality monitoring stations work this year to ensure the Elimination of 1 prov incial control, five water quality section 3 municipalities controlled deterioration, ens ure the creation this year of "clear rivers" standards. Second, pay special attention to pollution-cutting cons truction of nanotubes. Intercepting nanotubes are the basis of pollution of water source engineering, engineering, matter of success or failure of water management. Urban sewage treatment, to improve "effluent from sewage trea tment rate, running accuracy, complia nce" requirement, speed up the town's support network construction, is focus ing on nanotubes home "las t meters" question. Domestic sewage treatment in rural areas, this year is the final year of the three-year action, determination to fight and the momentum around, ending the battle on which fully to ensure the
rea lization of all County 648 formed village coverage. Also, be sure to attach importance to focus on rural domestic wastewater treatment facility operation and management, ensure that wastewa ter trea tment facility up and running, role play, avoid the "Sun" problem. Third, pay specia l attention to the River Lake pond desilting operation. Provinces now have focused on pollution control of water go to "dig up mud", as the deepening water of this year's "plays". Next, to jump-start an investigation line touches work, implementation plan according to the priorities and the prog ramme of work, in accorda nce with the "one river one policy" requires detailed cleaning, dredging plan, planning ahead of time clea ning out mud "way out", according to loca l conditions to do sludge, promote scientific res ource utilization of silt and mud. (B) the heavy regulation of heavily polluting indus tries. Pollution of water must grab the source, wastewater is primarily the source of backward production capacity,
increase the intensity of
A.拉伸
B.大气稳定
C.温度稳定
D.柔韧
10.根据《建筑内部装修设计防火规范))(GB50222-95),纸面石膏板属于( )
建筑材料。
A.不燃性
B.难燃性 P342
C.可燃性
D.易燃性
11.建(构)筑物的基础沉降观测点应埋设于( )。 P78
A.基础底板上
B.地下室外墙上
C.首层外墙上
D.基坑边坡上
12.关于基坑支护施工的说法,正确的是( )。 P87
A.锚杆支护工程应遵循分段开挖、分段支护的原则,采取一次挖就再行支护的方式
B.设计无规定时,二级基坑支护地面最大沉降监控值应为 8cm
C.采用混凝土支撑系统时,当全部支撑安装完成后,仍应维持整个系统正常运转直至
支撑面作业完成
D.采用多道内支撑排桩墙支护的基坑,开挖后应及时支护
13.结构厚度不大而面积或长度较大的混凝土浇筑宜采用( )浇筑方案。 P97
A.全面分层
B.分段分层
为了促进本公司各项经营活动由事后管理向事前管理方式的转变,强化生产经营全过程控制,提高资金使用的计划性,特制定本管理办法,以增加公司资金运行的透明度,降低各项成本,使有限的资金发挥最大的效能。 trea tment of heavily polluting industries. According to municipal, and municipal government deployment of seven big heavy pollution indus try regulation "three years action plans", requirements to December 2016 end of Qian, all included shut stopped eliminated of enterprise all shut stopped eliminated in pla ce; June 30, 2017 Qian, all included place regulation upgrade and agglomeration restructuring of enterprise by unified standard regulation in place, late not standard of enterprise are implementation discontinued; June 30, 2018 Qian, all intends Park production of enterprise relocation Park in place, la te not Park of are discontinued. In the process of renovation, will focus on four aspects: to firmly close the high energy consumption and heavy pollution, hopeless enterprise governance and production lines, eliminated a number of yearly emiss ion intens ity, low value-added products of backwa rd production capacity. Second, we mus t strictly enforce the
space, total project "Trinity " environment access system, promoting indus try access and environmental conditions of access of enterprises to the Park, industrial park, in principle, no longer the class on the new project. Thirdly, promoting replacement and recons truction of heavily polluting industries, mergers and reorganizations, guide enterprises to energy conservation, recycling and low-carbon and clean production, and improve the level of green development. Four to esta blis h a long-term supervision mechanism, increase the intensity of specia l inspections, investigate and punish the rectification is not in place, normal business of running anti-pollution installations do not. (Iii) linkage to promote flood control water, drainage, water supply, improving water saving. Speed up cross Yang suppor t river dike reinforcement, and along Pu seawall except insurance reinforcement, and Lake Qian sluice, and BA Cao sluice, and cloud cover reservoir, focus flood control dra inage engineering
construction, vigorously implementation "strong library" "solid di" "sprea d row" engineering, increased geolog ical disaster hidden points governance efforts, solid advance small basin torrent disaster governance, efforts from essentially solution basin sex, and regiona l flood control dra inage capacity insufficient of problem. Vigorously implement the piers, algae and other water sources protection and, promoting rural drinking water safety projects, setting up water pricing reform and environmenta l protection mechanism, guiding water depth. Further soil pollution and repa ir, streng then agricultura l non-point source pollution prevention, mountain, water, forests, fields, lakes, various elements mutual long. Four, manage to tighten control, to play "three to split" battle. Xia Baolong, Secretary of provincial party Committee stressed that while the "three to split" operation time is over three years, but "three to split" must continue to catch on, and resolve a split cannot be changed. All loca lities
and departments to the village and "no una uthorised" crea ted
videoconference, Secretary of the provincial Committee of Xia Baolong stressed: this year is the "five water trea tment" "357" timetables "for three years to resolve outstanding issues, obv ious ly worked," victory of the year. The County 's departments at all levels mus t firmly establis h the "gua nghui is gold and silver" green development concept, convinced that Castle is not relaxed, always mainta ining strategic ability and strong determination to improve the environment, consistently playing well "five water treatment of" winning the war, ever-higher levels of comprehens ive well-off society was built. (A) lay the sewage uphill battle. This year we will "river water quality improved at the county level, up to five" this bas ic objective grasp of pollution control that focus, with the focus on three things: a good job, "clear rivers" reaching the County crea ted. Organization "look back" specia l inspection, the County garbage River, black and odorous River is "Dragnet" investigation, timely rectification of
problems found in place firmly to prevent river pollution rebound. In accordance with the "one-stop strategy", improving the inferior five water quality monitoring stations work this year to ensure the Elimination of 1 prov incial control, five water quality section 3 municipalities controlled deterioration, ens ure the creation this year of "clear rivers" standards. Second, pay special attention to pollution-cutting cons truction of nanotubes. Intercepting nanotubes are the basis of pollution of water source engineering, engineering, matter of success or failure of water management. Urban sewage treatment, to improve "effluent from sewage trea tment rate, running accuracy, complia nce" requirement, speed up the town's support network construction, is focus ing on nanotubes home "las t meters" question. Domestic sewage treatment in rural areas, this year is the final year of the three-year action, determination to fight and the momentum around, ending the battle on which fully to ensure the
rea lization of all County 648 formed village coverage. Also, be sure to attach importance to focus on rural domestic wastewater treatment facility operation and management, ensure that wastewa ter trea tment facility up and running, role play, avoid the "Sun" problem. Third, pay specia l attention to the River Lake pond desilting operation. Provinces now have focused on pollution control of water go to "dig up mud", as the deepening water of this year's "plays". Next, to jump-start an investigation line touches work, implementation plan according to the priorities and the prog ramme of work, in accorda nce with the "one river one policy" requires detailed cleaning, dredging plan, planning ahead of time clea ning out mud "way out", according to loca l conditions to do sludge, promote scientific res ource utilization of silt and mud. (B) the heavy regulation of heavily polluting indus tries. Pollution of water must grab the source, wastewater is primarily the source of backward production capacity,
increase the intensity of
C.斜面分层
D.截面分层
14.关于加气混凝土砌块工程施工,正确的是( )。 P121
A.砌筑时必须设置皮数杆,拉水准线
B.上下皮砌块的竖向灰缝错开不足 150mm 时,应在水平灰缝设置 500mm 长 2Φ6
拉结筋
C.水平灰缝的宽度宜为 20mm,竖向灰缝宽度宜为 15mm
D.砌块墙的 T 字交接处应使用纵墙砌块隔皮露端面,并坐中于横墙砌块
15.建筑物基坑采用钎探法验槽时,钎杆每打入土层( )mm,应记录一次锤击数。
P92
A.200
B.250
C.300
D.350
16.建筑型钢结构 B 类防火涂料的耐火极限可达( )h. 134
A.0.5-1.0
B.0.5~1.5
C.0.5~2.0
D.1.5-3.0
17.关于轻质隔墙工程的施工做法,正确的是( )。 P155
A.当有门洞口时,墙板安装从墙的一端向另一端顺序安装·
B.抗震设防区的内隔墙安装采用刚性连接
C.在板材隔墙上直接剔凿打孔,并采取保护措施
D.在设备管线安装部位安装加强龙骨
为了促进本公司各项经营活动由事后管理向事前管理方式的转变,强化生产经营全过程控制,提高资金使用的计划性,特制定本管理办法,以增加公司资金运行的透明度,降低各项成本,使有限的资金发挥最大的效能。 ropetubeprotection.(3)positionoftheswitchboxmustbeplacedcorrectly,prohibit revePartsarenotalloweddirectcontactwiththeground,madeofimpermeablematerialatthebottompad100mm.D,packingandtransportforallmaterialsareusedtomakedecorativeuses,soallofthecompany'sfactoryfinishedandsemi-finishedproductsareimportedprotectivetapetoprotectthesurfaceofthematerial,soasnottodamagesurfaceduringtransport,Setup,andthentransportedbyfibrousbandsorpackedintothescene.Afterthematerialsdeliveredtothesite,specialprotectionandbuildersaroundcarefulcoordination.Allmaterialsdeliveredtothesite,whereareplacedinaventilatedshelter.8,on-siteinstallationoftechnicalcontrolandschedulecontrolofpersonnel'squalityandtechnologyisanimportantfactorindeterminingquality.Ourinstallersareprofesionallytrainedskiledworkers,thecompanydoingtheengineeringexercisetrainedanumberoftechnicalstandardshigh,strongoperationalskilsoftheconstructionteam,hasaccumulatedrichexperienceinconstruction.Forthisproject, selectedthebestpersonnelandequippedwithAdvancedinstallationtechniquesandequipment.Beforetheapproach,byrelevantleadersontheimportanceofthisproject,sothatinstalershaveenoughawarenessbytechniciansontherelevantstandardspecificationsandsafetyguidelinesalltechnologytoBuildergivesthelow-d
treatment
own.
of heavily polluting indus tries. According to municipal, and municipa l government deployment of seven big heavy pollution industry regulation "three years action pla ns", requirements to December 2016 end of Qian, all included shut stopped eliminated of enterprise all shut stopped elimina ted in place; June 30, 2017
Qian, all included pla ce regulation upgrade and agglomeration res tructuring of enterprise by unified standard regulation in place, late not standa rd of enterprise are implementation discontinued; June 30, 2018 Qian, all intends Park production of enterprise relocation Park in pla ce, late not Park of are discontinued. In the process of renovation, will focus on four aspects: to firmly close the high energy consumption and heavy pollution, hopeless enterprise governance and production lines, eliminated a number of yearly emission intensity, low value-added products of backward production capacity. Second, we must strictly enforce the space, total project "Trinity" environment access system, promoting industry access and environmental conditions of access of enterprises to the Park, industrial park, in principle, no longer the class on the new project. Thirdly, promoting replacement and recons truction of heavily polluting industries, mergers and reorganizations, guide enterprises to energy
conservation, recycling and low-carbon and clean production, and improve the level of green development. Four to establish a long-term supervis ion mechanism, increase the intensity of specia l inspections, investigate and punish the rectification is not in pla ce, normal bus iness of running anti-pollution installations do not. (Iii) linkage to promote flood control water, dra inage, water supply, improving water saving. Speed up cross Yang support river dike reinforcement, and along Pu seawall except insurance reinforcement, and Lake Qian sluice, and BA Cao sluice, and cloud cover reservoir, focus flood control dra inage engineering construction, vigorous ly implementation "strong library" "s olid di" "spread row" engineering, increased geological disas ter hidden points governance efforts, solid advance small basin torrent disaster governance, efforts from essentially solution bas in sex, and regional flood control drainage capacity ins ufficient of problem. Vigorous ly implement the piers, algae and
other water sources protection and, promoting rural drinking water safety projects, setting up water pricing reform and environmenta l protection mechanism, guiding water depth. Further soil pollution and repa ir, streng then agricultura l non-point source pollution prevention, mountain, water, forests, fields, lakes, various elements mutual long. Four, manage to tighten control, to play "three to split" battle. Xia Baolong, Secretary of provincial party Committee stressed that while the "three to split" operation time is over three years, but "three to split" must continue to catch on, and resolve a split cannot be changed. All loca lities and departments to the village and "no unauthorised" created
videoconference, Secretary of the provincial Committee of Xia Baolong stressed: this year is the "five water trea tment" "357" timetables "for three years to resolve outstanding issues, obv ious ly worked," victory of the year. The County 's departments at all levels mus t firmly establis h the "gua nghui is gold and silver" green development concept, convinced that Castle is not relaxed, always mainta ining strategic ability and strong determination to improve the environment, consistently playing well "five water treatment of" winning the war, ever-higher levels of comprehens ive well-off society was built. (A) lay the sewage uphill battle. This year we will "river water quality improved at the county level, up to five" this bas ic objective grasp of pollution control that focus, with the focus on three things: a good job, "clear rivers" reaching the County crea ted. Organization "look back" specia l inspection, the County garbage River, black and odorous River is "Dragnet" investigation, timely rectification of
problems found in place firmly to prevent river pollution rebound. In accordance with the "one-stop strategy", improving the inferior five water quality monitoring stations work this year to ensure the Elimination of 1 prov incial control, five water quality section 3 municipalities controlled deterioration, ens ure the creation this year of "clear rivers" standards. Second, pay special attention to pollution-cutting cons truction of nanotubes. Intercepting nanotubes are the basis of pollution of water source engineering, engineering, matter of success or failure of water management. Urban sewage treatment, to improve "effluent from sewage trea tment rate, running accuracy, complia nce" requirement, speed up the town's support network construction, is focus ing on nanotubes home "las t meters" question. Domestic sewage treatment in rural areas, this year is the final year of the three-year action, determination to fight and the momentum around, ending the battle on which fully to ensure the
rea lization of all County 648 formed village coverage. Also, be sure to attach importance to focus on rural domestic wastewater treatment facility operation and management, ensure that wastewa ter trea tment facility up and running, role play, avoid the "Sun" problem. Third, pay specia l attention to the River Lake pond desilting operation. Provinces now have focused on pollution control of water go to "dig up mud", as the deepening water of this year's "plays". Next, to jump-start an investigation line touches work, implementation plan according to the priorities and the prog ramme of work, in accorda nce with the "one river one policy" requires detailed cleaning, dredging plan, planning ahead of time clea ning out mud "way out", according to loca l conditions to do sludge, promote scientific res ource utilization of silt and mud. (B) the heavy regulation of heavily polluting indus tries. Pollution of water must grab the source, wastewater is primarily the source of backward production capacity,
increase the intensity of
18.当设计无要求时,关于无粘接预应力筋张拉施工的做法,正确的是( )。 P138
A.先张拉楼面梁,后张拉楼板
B.梁中的无粘接筋可按顺序张拉
C.板中的无粘接筋可按顺序张拉
D.当曲线无粘接预应力筋长度超过 30m 时宜采用两端张拉
19.吊顶工程施工中,明龙骨饰面板的安装应符合( )的规定。 P154
A.确保企口的相互咬接及图案花纹吻合
B.玻璃吊顶龙骨上留置的玻璃搭接应采用刚性连接
C.装饰吸声板严禁采用搁置法安装,
D.饰面板与龙骨嵌装时,饰面板应事先加工成坡口
20.《建筑装饰装修工程质量验收规范 (GB 50210--2001)规定,幕墙构架立柱的
连接金属角码与其他连接件的连接应采用( )连接。 P164
A.铆接
B.螺栓
C.双面焊
D.单面焊
参考答案:
1.B 2.C 3.D 4.D 5.A 6.A 7.C 8.D 9.B 10.B
11.A 12.D 13.B 14.A 15.C 16.C 17.D 18.C 19.A 20.B
二、多项选择题(共 10 题,每题 2 分。每题的备选项中,有 2 个或 2 个以上符合题
意,至少有 1 个错项。错选,本题不得分;少选,所选的每个选项得 0.5 分)
21.关于非抗震设计的框架结构,不同部位震害程度的说法,正确的有( )。 P15
A.柱的震害轻于梁
B.柱顶震害轻于柱底
为了促进本公司各项经营活动由事后管理向事前管理方式的转变,强化生产经营全过程控制,提高资金使用的计划性,特制定本管理办法,以增加公司资金运行的透明度,降低各项成本,使有限的资金发挥最大的效能。 trea tment of heavily polluting industries. According to municipal, and municipal government deployment of seven big heavy pollution indus try regulation "three years action plans", requirements to December 2016 end of Qian, all included shut stopped eliminated of enterprise all shut stopped eliminated in pla ce; June 30, 2017 Qian, all included place regulation upgrade and agglomeration restructuring of enterprise by unified standard regulation in place, late not standard of enterprise are implementation discontinued; June 30, 2018 Qian, all intends Park production of enterprise relocation Park in place, la te not Park of are discontinued. In the process of renovation, will focus on four aspects: to firmly close the high energy consumption and heavy pollution, hopeless enterprise governance and production lines, eliminated a number of yearly emiss ion intens ity, low value-added products of backwa rd production capacity. Second, we mus t strictly enforce the
space, total project "Trinity " environment access system, promoting indus try access and environmental conditions of access of enterprises to the Park, industrial park, in principle, no longer the class on the new project. Thirdly, promoting replacement and recons truction of heavily polluting industries, mergers and reorganizations, guide enterprises to energy conservation, recycling and low-carbon and clean production, and improve the level of green development. Four to esta blis h a long-term supervision mechanism, increase the intensity of specia l inspections, investigate and punish the rectification is not in place, normal business of running anti-pollution installations do not. (Iii) linkage to promote flood control water, drainage, water supply, improving water saving. Speed up cross Yang suppor t river dike reinforcement, and along Pu seawall except insurance reinforcement, and Lake Qian sluice, and BA Cao sluice, and cloud cover reservoir, focus flood control dra inage engineering
construction, vigorously implementation "strong library" "solid di" "sprea d row" engineering, increased geolog ical disaster hidden points governance efforts, solid advance small basin torrent disaster governance, efforts from essentially solution basin sex, and regiona l flood control dra inage capacity insufficient of problem. Vigorously implement the piers, algae and other water sources protection and, promoting rural drinking water safety projects, setting up water pricing reform and environmenta l protection mechanism, guiding water depth. Further soil pollution and repa ir, streng then agricultura l non-point source pollution prevention, mountain, water, forests, fields, lakes, various elements mutual long. Four, manage to tighten control, to play "three to split" battle. Xia Baolong, Secretary of provincial party Committee stressed that while the "three to split" operation time is over three years, but "three to split" must continue to catch on, and resolve a split cannot be changed. All loca lities
and departments to the village and "no una uthorised" crea ted
温馨提示:当前文档最多只能预览 7 页,此文档共15 页,请下载原文档以浏览全部内容。如果当前文档预览出现乱码或未能正常浏览,请先下载原文档进行浏览。
1 / 7 15