A.项目指导委员会 steering committee
B.合同交付负责人 principal of contract implementatio
C.市场商务负责人 principalof marketing and business affairs
D.技术方案负责人 principal of technical scheme
A.设计文件(包括设计变更单) design files(inculding design change sheets
B.材料质量证明书 material quality report
C.隐蔽工程记录 covered work report
D.混凝土抗压强度试验报告 concrete compressive strength report
开始考试点击查看答案A.竣工材料Project Completeness Documents
B.工程遗留问题engineering pending issues
C.开通设备Running Equipments
D.备板备件 Spare parts
E.技能technical knowledge
开始考试点击查看答案A.项目经理project manager
B.工程实施经理engineering implementation manager
C.工程技术经理engineering technical manager
D.客户代表Customer Representative
开始考试点击查看答案A.接受项目经理下达的指令Execute project as the order from Project Manager
B.接收、确认并向工程督导传递工程安装相关信息Collect, confirm and transfer to project supervisor the engineering installation information.
C.负责工程安装进度协调、监控Supervise & Coordinate the Engineering Installation Process
D.负责设备安装验收组织工作 Organize the engineering installation acceptancet
开始考试点击查看答案A.对项目执行中外包商的工程服务等能力提供评估意见。 Give evaluation opinion on subcontractor’s engineering service competence.
B.负责外包项目的现场管理和评估,对项目执行的成本、质量、进度负责。manage and evaluate outsourcing project and be accountable for project implementation cost, quality and progress.
C.负责招标洽谈项目的组织和策划,对招标洽谈项目的流程规范性和结果合理性负责。 organize and plan the bidding projects, be responsible for the standardization of bidding negotiation process and rationality of bidding negotiation conclusions.
D.负责提供外包项目结算前的评估意见。 give evaluation opinion before outsourcing project settlement.
开始考试点击查看答案A.物料齐套性 Whole set of material
B.工程计划 Engineering pla
C.合同交付条款 Contract delivery clause
D.工勘报告提交及时性与准确性 The accuracy and timeliness of site survey report.
开始考试点击查看答案A.尽早给物流提供工程计划,以便合理安排供货。Provide the engineering plan to Logistics as soon as possible, in order to arrange the material supplying reasonably.
B.及时、准确提供工勘 Provide the accurate site survey report in time.
C.尽量使用标配设备和物料 Use standard configured equipment and materials as much as possible.
D.抢占其他项目资源 Occupy other project resources.
E.减少配置及工勘变更 Reduce the alteration of configuration and site survey.
开始考试点击查看答案A.质量计划 Quality pla
B.质量宣传 Quality publicatio
C.质量策划 Quality planning
D.质量保证 Quality assurance
E.质量控制Quality control
F.质量检查Quality inspectio
开始考试点击查看答案A.日常信息交流制度 rules on daily information communications
B.周报周例会制度 rules on weekly report and weekly meeting
C.绩效考核制度 rules on performance evaluatio
D.财务报销和费用控制制度 rules on reimbursement and expense controlling
E.后勤管理制度(用食宿等) rules on logistics management (for car usage,room and board,etc)
开始考试点击查看答案高中教育高考英语2012年高考英语(重庆卷)解析版
类别:学历类其它高中教育高考英语2012年高考英语(辽宁卷)解析版
类别:学历类其它高中教育高考英语2012年高考英语(福建卷)解析版
类别:学历类其它高中教育高考英语2012年高考英语(新课标卷)解析版
类别:学历类其它高中教育高考英语2012年福建高考英语(单项选择)
类别:学历类其它高中教育高考英语2012年上海市春季高考英语解析版
类别:学历类其它高中教育高考英语2011年高考黑龙江模拟预测卷(三)英语试卷
类别:学历类其它高中教育高考英语2011年高考黑龙江模拟预测卷(一)
类别:学历类其它高中教育高考英语2011年高考辽宁英语模拟预测卷(二)
类别:学历类其它高中教育高考英语2011年高考辽宁英语模拟预测卷(一)
类别:学历类其它长理培训客户端 资讯,试题,视频一手掌握
去 App Store 免费下载 iOS 客户端