项目管理师PMP美国项目管理PMPPMP认证考试练习题(19,20)
题目内容

the quality risk (    ) .

2024-07-09

A.is minimized through continuous monitoring.

B.is considered a long term risk.

C.will be reflected in the in-service life of the project result.

D.b and c

E.all of the above.

题目答案

试卷相关题目

最新试卷
热门试卷

长理培训客户端 资讯,试题,视频一手掌握

去 App Store 免费下载 iOS 客户端