项目管理师PMP美国项目管理PMPPMP认证考试练习题(29,30)
题目内容

As a project is carried out and slack time is consumed on individual tasks, the slack left over for the remaining tasks is:

2024-07-09

A.Insignificant.

B.Reduced.

C.Unchange

D.C.Unchanged.D.Increased.

E.Doubled.

题目答案

试卷相关题目

最新试卷
热门试卷

长理培训客户端 资讯,试题,视频一手掌握

去 App Store 免费下载 iOS 客户端