项目管理师PMP美国项目管理PMPPMP认证考试练习题(5.6)
题目内容

the rule of seven used by quality control engineers states that if a run of seven or more samples lays on one side of the process mean, thenthe process is out of control. what is the probability that this condition is the result of random variations.

2024-07-09

A.0.143

B.0.0312

C.0.0273

D.0.0156

E.0.0078

题目答案

试卷相关题目

最新试卷
热门试卷

长理培训客户端 资讯,试题,视频一手掌握

去 App Store 免费下载 iOS 客户端