A.The availability of funds using overall plan value
B.The availability of funds according to tolerance limits
C.The availability of funds in object currency
D.The availability of funds on period level
A.Cost of goods sold split by cost components
B.Value of "Gross Margin 2"
C.Production variances split by variance categories
D.Value of conditions of pricing procedure
开始考试点击查看答案A.It is a desktop browser that integrates with SAP S/4HANA.
B.It is the frontend used to define reports in Analysis for Office.
C.It is available as an additional license product in SAP S/4HANA.
D.It is a design studio app that comes as standard SAP Fiori content.
开始考试点击查看答案A.It is a structure to which all cost center groups create for a controlling area are assigned.
B.It is a structure to which all cost center groups created within an operating concern are assigned.
C.It is a structure to which all the cost centers within an operating concern are assigne
D.D.It is a structure to which all the cost centers within a controlling area are assigned.
开始考试点击查看答案A.Value in Controlling Area Currency
B.Version
C.Record type
D.Cost element
开始考试点击查看答案A.All company codes where profit center accounting is activated.
B.All company codes maintained in your authorization profile
C.All company codes within the controlling area.
D.All company codes to which the profit center standard hierarchy is assigned to.
开始考试点击查看答案A.Relevance of cost component to inventory valuation
B.Assignment of cost component to calculation base for overheads in costing sheet
C.Relevance of cost component to results analysis
D.Relevance of cost component to goods manufactured
E.Assignment of cost component of cost component group
开始考试点击查看答案A.Set the relevant indicators in the CO version.
B.Set the relevant indicator in the controlling area.
C.Set the relevant indicator in the planning profile of the order type.
D.Set the relevant indicator in the internal order master record.
开始考试点击查看答案A.Result Analysis (RA) Version
B.Result Analysis (RA) key
C.Costing variant for preliminary costing
D.Variance variant
开始考试点击查看答案A.Cycle iteration
B.Tracing factor
C.Sender cost objects
D.Template
开始考试点击查看答案A.Credit component (of the costing sheet)
B.Allocation structure
C.Settlement profile
D.Settlement rule
开始考试点击查看答案注册安全工程师注册安全工程师安全生产技术2014年安全工程师
类别:建筑类其它注册安全工程师注册安全工程师安全生产技术2014年安全工程师
类别:建筑类其它注册安全工程师注册安全工程师安全生产技术2014年安全工程师
类别:建筑类其它注册安全工程师注册安全工程师安全生产技术2014年安全工程师
类别:建筑类其它注册安全工程师注册安全工程师安全生产技术2014年安全工程师
类别:建筑类其它注册安全工程师注册安全工程师安全生产技术2014年安全工程师
类别:建筑类其它注册安全工程师注册安全工程师安全生产技术2014年安全工程师
类别:建筑类其它注册安全工程师注册安全工程师安全生产技术2014年安全工程师
类别:建筑类其它注册安全工程师注册安全工程师安全生产技术2014年安全工程师
类别:建筑类其它注册安全工程师注册安全工程师安全生产技术2014年安全工程师
类别:建筑类其它长理培训客户端 资讯,试题,视频一手掌握
去 App Store 免费下载 iOS 客户端