项目管理师PMP美国项目管理PMPPMP认证考试练习题(29,30)
题目内容

The range of time allowed for an activity to be completed in is the (    ).

2024-07-09

A.Planned time (Duration).

B.Float time (LS - ES, or LF - EF).

C.Critical time (when ES = LS, or EF = LF).

D.Scheduled time (LF - ES).

E.Event.

题目答案

试卷相关题目

最新试卷
热门试卷

长理培训客户端 资讯,试题,视频一手掌握

去 App Store 免费下载 iOS 客户端