A.Planned time (Duration).
B.Float time (LS - ES, or LF - EF).
C.Critical time (when ES = LS, or EF = LF).
D.Scheduled time (LF - ES).
E.Event.
A.Changing the task duration.
B.Reduce the free float of an activity.
C.Executing a backward pass
D.A or B.
E.None of the above.
开始考试点击查看答案A.Early start of the succeeding activities.
B.Late start of the succeeding activities.
C.Project finish.
D.Cost of the project.
E.None of the above.
开始考试点击查看答案A.0.5
B.1
C.1.8
D.2.2
E.2.8
开始考试点击查看答案A.As many tasks as possible.
B.Non critical tasks.
C.Accelerating performance of tasks on critical path.
D.Accelerate performance by minimizing cost.
E.A and D.
开始考试点击查看答案A.8
B.8.8
C.9.1
D.9.7
E.10.5
开始考试点击查看答案A.Build house
B.Excavate
C.Prepare Foundation
D.B and C.
E.None of the above
开始考试点击查看答案房地产经纪人房地产经纪人房地产经纪相关知识2009年房地产经
类别:建筑类其它房地产经纪人房地产经纪人房地产经纪相关知识2009年房地产经
类别:建筑类其它房地产经纪人房地产经纪人房地产经纪相关知识2009年房地产经
类别:建筑类其它房地产经纪人房地产经纪人房地产经纪相关知识2009年房地产经
类别:建筑类其它房地产经纪人房地产经纪人房地产经纪相关知识2009年房地产经
类别:建筑类其它房地产经纪人房地产经纪人房地产经纪相关知识2009年房地产经
类别:建筑类其它房地产经纪人房地产经纪人房地产经纪相关知识2009年房地产经
类别:建筑类其它房地产经纪人房地产经纪人房地产经纪相关知识2009年房地产经
类别:建筑类其它房地产经纪人房地产经纪人房地产经纪相关知识2009年房地产经
类别:建筑类其它房地产经纪人房地产经纪人房地产经纪相关知识2009年房地产经
类别:建筑类其它长理培训客户端 资讯,试题,视频一手掌握
去 App Store 免费下载 iOS 客户端