A.prevent the gear box from leaking
B.prevent the oil from becoming inflammable(易燃的)
C.make sure it has not become contaminated(污染)
D.make sure the motor bearings are lubricated
A.stuffing boxes eliminate the leakage problems usually associated with other gear pumps
B.it is not necessary to closely maintain design clearances with this pump
C.they are essentially self-priming and produce a high suction lift
D.these pumps are designed with extreme tooth angles
开始考试点击查看答案A.hydraulic pumps
B.valves
C.hydraulic cylinders
D.hydraulic motors
开始考试点击查看答案A.fill the unit with saltwater
B.fill the unit with descaling compound
C.completely drain the unit
D.tightly seal the unit to exclude air
开始考试点击查看答案A.dispose
B.dissolve
C.heat
D.dissipates
开始考试点击查看答案A.mixed with clean oil
B.purified
C.heated
D.strained
开始考试点击查看答案A.repack all valve stems
B.lubricate it prior to use
C.replace the foundation bolts
D.balance the warping heads
开始考试点击查看答案A.half the breaking strength of the mooring line
B.the full breaking strength of the mooring line
C.the maximum expected tension(张力) of the mooring line
D.50% over the working tension of the mooring line
开始考试点击查看答案A.warm-up allows the hydraulic system to become charged with oil
B.warm-up allows the relief valves to be properly tested
C.hydraulic strainers operate only during the warm-up period
D.hydraulic fluid must be at the proper viscosity
开始考试点击查看答案A.a rush
B.an alternating
C.a direct
D.an exciting
开始考试点击查看答案A.number of turns of wire in the armature coil
B.number of magnetic poles
C.strength of the magnets used
D.output voltage
开始考试点击查看答案投资项目管理师投资项目管理师宏观经济政策2010年投资项目管
类别:建筑类其它投资项目管理师投资项目管理师宏观经济政策2010年投资项目管
类别:建筑类其它投资项目管理师投资项目管理师宏观经济政策2010年投资项目管
类别:建筑类其它投资项目管理师投资项目管理师宏观经济政策2010年投资项目管
类别:建筑类其它投资项目管理师投资项目管理师宏观经济政策2009年投资建设项
类别:建筑类其它房地产经纪人房地产经纪人房地产经纪相关知识2013年房地产经
类别:建筑类其它房地产经纪人房地产经纪人房地产经纪相关知识2013年房地产经
类别:建筑类其它房地产经纪人房地产经纪人房地产经纪相关知识2013年房地产经
类别:建筑类其它房地产经纪人房地产经纪人房地产经纪相关知识2013年房地产经
类别:建筑类其它房地产经纪人房地产经纪人房地产经纪相关知识2013年房地产经
类别:建筑类其它长理培训客户端 资讯,试题,视频一手掌握
去 App Store 免费下载 iOS 客户端