推荐等级:A.noise
B.selective filtering
C.selective perception
D.medium problems
E.all of the above.
开始考试练习点击查看答案A.cost factors (least cost alternatives)
B.competitors' method of sourcing
C.existence of sufficient administration/technical personnel
D.political and social factors
E.none of the above.
开始考试练习点击查看答案A.assures all work is identified
B.subdivides the project into manageable segments
C.provides the project sponsor with a time-phase task summary
D.both a and b
E.all of the above.
开始考试练习点击查看答案A.tactile
B.audio
C.olfactory
D.visual
E.all of the above.
开始考试练习点击查看答案A.now becomes the new schedule, including the changes, and the original baseline is disregarded.
B.is still the original baseline but annotated to reflect that a change has taken place.
C.is amended to reflect the scope change, but the original baseline is still maintained for post-project review.
D.B.is still the original baseline but annotated to reflect that a change has taken plac
E.C.is amended to reflect the scope change, but the original baseline is still maintained for post-project review.D.is meaningless since every schedule update changes the baseline (i.e., a rubber baseline.)E.is the same since baseline schedules cannot change once the development phase is completed.
开始考试练习点击查看答案A.substitute for uncertainty analysis in risk quantification
B.estimate the level of risk aversion adopted by management
C.estimate the effect of change of one project variable on the overall project
D.a and b
E.all of the above.
开始考试练习点击查看答案A.in order to minimize financial losses from quality control problems, all problems which have a measurable cost associated with them should becorrected.
B.the majority of defects are caused by a small percentage of the identifiable problems. improvements efforts should be reserved for these vitalfew problems.
C.in order to achieve zero defects, all quality control problems, including those which do not have a direct financial cost should be correcte
D.B.the majority of defects are caused by a small percentage of the identifiable problems. improvements efforts should be reserved for these vitalfew problems.C.in order to achieve zero defects, all quality control problems, including those which do not have a direct financial cost should be corrected.D.generally, 80 % of the quality control problems are justifiable for correction via cost-benefit analysis. the remaining 20% are not financiallyworthy of improvement efforts.
E.a and d
开始考试练习点击查看答案A.multiplying the actual hours worked on the project by the budgeted labor rate.
B.multiplying the budgeted hours to complete the task by the budgeted labor rate.
C.dividing the actual hours required to complete the task by the budgeted labor rate.
D.cannot be determined.
E.none of the above
开始考试练习点击查看答案A.matrix
B.classical
C.expediter
D.coordinator
E.pure project
开始考试练习点击查看答案A.assistance
B.sealed bidding
C.competitive proposals
D.acquisition
E.small purchases
开始考试练习点击查看答案高中教育高考语文(重庆卷)2013年普通高等学校招生全国统一考试
类别:学历类其它高中教育高考语文高考语文第一轮复习测试题9
类别:学历类其它高中教育高考语文高考语文第一轮复习测试题8
类别:学历类其它高中教育高考语文高考语文第一轮复习测试题6
类别:学历类其它高中教育高考语文高考语文第一轮复习测试题4
类别:学历类其它高中教育高考语文高考语文第一轮复习测试题3
类别:学历类其它高中教育高考语文高考语文第一轮复习测试题2
类别:学历类其它高中教育高考语文高考语文第一轮复习测试题1
类别:学历类其它高中教育高考语文高中语文课课练(5)
类别:学历类其它高中教育高考语文高中语文总复习 经典易错题会诊与命题角度
类别:学历类其它长理培训客户端 资讯,试题,视频一手掌握
去 App Store 免费下载 iOS 客户端