¥5.00
推荐等级:A.the number of periods required to recover the initial investment
B.the rate of return on the investment
C.the number of periods required to bring project cost back to the original budget, based on current performance
D.loan payment schedule
E.none of the above
开始考试练习点击查看答案A.advertising
B.invitation
C.negotiation
D.purchase
E.all are acquisition methods
开始考试练习点击查看答案A.0.25
B.0.85
C.0.5
D.1
E.0.33
开始考试练习点击查看答案A.speed up a project through parallel tasks.
B.swap one task for another.
C.reduce the number of tasks if possible.
D.b and c.
E.none of the above.
开始考试练习点击查看答案A.product undergoes casual in-house testing
B.client requests additional work not covered under contract
C.project manager calls a meeting
D.b and c only
E.none of the above
开始考试练习点击查看答案A.used to derive a consensus arriving at a convergent solution
B.useful in determining probability relating to future events.
C.used with questionnaires based on established scenarios.
D.continued as an iterative process until a solution is reached.
E.all of the above.
开始考试练习点击查看答案A.a diversion is needed
B.conflictive situations are in their early stages and emotional involvement is low
C.conflictive situations are in their late stages and emotional involvement is high
D.conflict may cause a loss of status or position power
开始考试练习点击查看答案A.deduct 10% of the invoice amount for payment within 30 days
B.deduct 2% of the invoice for payment within 10 days
C.incurs a penalty on 10% for payments more than 30 days late
D.settle the invoice with 2 equal payments; one within 10 days and the other within 30 days
E.none of the above
开始考试练习点击查看答案A.using imprecise language (i.e. nearly, approximately)
B.mixing tasks, specifications, special instructions and approvals
C.no pattern, structure or chronological order
D.wide variation in the size of tasks or details of work
E.all of the above
开始考试练习点击查看答案A.function of planned time/real time project costs.
B.risk identified in successful project completions.
C.(standard project deviation + expected costs)/6
D.cost of investment loss + least cost to restore status quo.
E.inherent risk at conception altered by standard project deviations.
开始考试练习点击查看答案高中教育高考语文(重庆卷)2013年普通高等学校招生全国统一考试
类别:学历类其它高中教育高考语文高考语文第一轮复习测试题9
类别:学历类其它高中教育高考语文高考语文第一轮复习测试题8
类别:学历类其它高中教育高考语文高考语文第一轮复习测试题6
类别:学历类其它高中教育高考语文高考语文第一轮复习测试题4
类别:学历类其它高中教育高考语文高考语文第一轮复习测试题3
类别:学历类其它高中教育高考语文高考语文第一轮复习测试题2
类别:学历类其它高中教育高考语文高考语文第一轮复习测试题1
类别:学历类其它高中教育高考语文高中语文课课练(5)
类别:学历类其它高中教育高考语文高中语文总复习 经典易错题会诊与命题角度
类别:学历类其它长理培训客户端 资讯,试题,视频一手掌握
去 App Store 免费下载 iOS 客户端