项目管理师PMP美国项目管理PMPPMP认证考试练习题(5.6)
题目内容

a(n) (    ) system is designed to ensure the timely availability of nonhuman resources, and includes the cost in procurement, shipping/freight,storage and loss.

2024-07-09

A.inventory control.

B.materials management.

C.procurement.

D.all of the abov

E.E.a and c only.

题目答案

试卷相关题目

最新试卷
热门试卷

长理培训客户端 资讯,试题,视频一手掌握

去 App Store 免费下载 iOS 客户端